1) Supervision of 56” Dezful-Kuhdasht Transition Gas Pipeline
2) Supervision of Gas Distribution Projects for the South Khorasan Gas Company
3) F.S & Design of Abadan-Ahvaz-Arak Oil Pipeline
4) Detailed Design of Abarkouh-Naein 8th 56-In General Gas Transfer Pipeline
5) Supervision of 40” lakan-Astara Transition Gas Line
6) Supervision of 40” Parsian-Safadasht Gas Line
7) Supervision of Constructing West & South of Tehran Gas Lines
8) Supervision of 16” & 20” Iranshahr-Kash-Palizan Gas Line
9) Supervision of 36” Darre Abbas-Mahshar Gas Line
10) Supervision & Third Party Technical Inspection of 8th 56” Ahvaz-Dezfoul-Kouhdasht General Gas Transfer Pipeline (EPC)
11) Supervision of All of the Gas Line Projects of South Khorasan
12) Detailed Design of Ahram-Ahwaz 9th 56-In General Gas Transfer Pipeline
13) Design and Construction of the Kuhdash/Naftshahr 48-In Pipeline (Iraq Export) and a Pressure Control Station
14) Basic Study and Detailed Design of the 11th General Pipeline (Abarkuh-Damghan)
15) Detailed Design of the Ahwaz-Poldokhtar 6th 56-In General Pipeline
16) Light-Fiber Cabling in Rey-Ahvaz Route (800 Km)
17) Supervising 48″ and 56″ Tehran 5th Transition Gas Line (240 Km)
18) Supervising of 30″ Sangbast-Roshtkhar Transition Gas Line (125 Km)
19) 30″ Kermanshah-EslamAbad Transition Gas Line (68 Km)
20) Supervising of 20″ Noodeh Pashang-Gonabad Transition Gas Line (130 Km)
21) Supervising of 10″ Torbatejam-Taybad Transition Gas Line (63 Km)
22) Supervising of 12″ Transition Gas Line to Dastjerd (45 Km)
23) Gas Pipelines to South of Khorasan (400 Km) (Phase 1 & 2)
24) 56″ Gas Pipeline to Tehran (190 Km) (Phase 1 & 2)
25) 40″ Gas Pipeline to South of Isfahan (25 Km) (Phase 1 & 2)
26) Alignment Study for Kangan Refinery 2nd Gas Line Loope Extention (62 Km)
27) 10″ Pipeline to Gachsaran-Shiraz (20 Km)
28) Re-execution of 8″ Naftshahr-Kermanshah Oil Pipelines (12 Km)
29) Fabrication of Two 40 Million Liter Tanks in Rey 20″ Shahrood-Mashhad Cover Transition (100Km)
30) Ahvaz-Sabzab 10″,16″ Crude Oil Pipelines (120 Km)
31) Rehabilatition of Rey-Ahvaz Five Pump Stations and Installation of 15 Turbo-Pumps
32) Rey Pump Station,Installation of Turbo-Pumps and Control Room
33) Preparing of Tender Documents for Water Supply to Zagheh Oil Zone (30 Km) (Phase 1 & 2)
34) Preparing of Tender Documents for Water Supply to Koohemond Oil Zone (25 Km) Road Making and Water
35) Supply in Kouhemond Oil Zone (60 Km) (Phase 1 & 2)
36) Road Making and Water Supply in Zaqeh Oil Zone (Phase 1 & 2)